49 Oak Brook Center, Oak Brook, IL Architect: None (Direct to Owner) General Contractor: None (Direct to Owner) Kelso-Burnett Co. completed the interior build-out of Microsoft Corporation’s 5th U.S. store located in Oak Brook, Illinois. The grand opening of the new 4,400 square-foot Microsoft Store in the Oakbrook Center coincided with the arrival of Microsoft’s newest gaming system, Xbox Kinect. Kelso-Burnett technicians installed 288 […]
Three Lakes Drive, Northfield, IL Architect: Various General Contractor: Pepper Construction, Executive Construction Inc., & more Kelso-Burnett Co. completed all of the original electrical and structured cabling installations for Kraft’s 3.2 million square-foot corporate headquarters facility in Northfield, Illinois. At the expansive complex, we not only installed the building’s distribution and lighting systems, but also installed all of the ComEd vaults, underground utility duct […]
1955 W. Field Court, Lake Forest, IL Architect: Solomon Cordwell Buenz General Contractor: Pepper Construction Recently, Kelso-Burnett Co. completed the three-story, 63,000 square-foot build-out of Packaging Corporation of America’s corporate headquarters. The Kelso-Burnett team, consisting of 14 electricians during the peak of construction, added an expansive Data Center on the first floor and added offices on the second and third floors. Due to Packaging […]
1 Takeda Parkway, Deerfield, IL Architect: tvsdesign General Contractor: Power Construction Recently, Kelso-Burnett completed nearly $10 million in electrical work in 10 months-time to a new six-story, 400,000 square foot building that achieved LEED Gold Certification. The new office building is the third of its kind on Takeda’s campus which consisted of various electrical, fire alarm, voice/data, sound masking, CATV, wireless, and audio/visual installations. […]
100 Grainger Parkway, Lake Forest, IL Architect: Perkins & Will General Contractor: Pepper Construction Considered one of Kelso-Burnett’s largest contracts to date, Kelso-Burnett was responsible for all electrical work throughout the 950,000 square-foot W.W. Grainger headquarters facility. Our team installed all lighting fixtures as well as an electrical distribution system, general office receptacles, redundant switchboards with a generator backup, and power and control wiring […]
16750 S. Center Street, Harvey, IL Architect: Patrick Engineering General Contractor: Patrick Engineering Recently, Kelso-Burnett Co. worked to complete a large conveyor system upgrade project at the CN WorldWide Grain Distribution Center in Harvey, Illinois. Kelso-Burnett Co. electricians worked with Patrick Engineering to install all of the electrical switches and controls for a new conveyor system that transfers grain from grain-cars to cargo containers […]
Illinois – Bedford Park, Wheeling Architect: Various General Contractor: HK Systems, Inc For many years, Kelso-Burnett Co. has been working with FedEx to keep up with their growing operational needs. In Wheeling, Illinois, Kelso-Burnett worked to increase the facilities size by constructing a new addition to an existing warehouse. Kelso-Burnett Co. electricians installed new conveyors, panels, high voltage stations, new shoots for mail sorting, […]
1700 E. Fairview Drive, DeKalb, IL Architect: Various General Contractor: Various For many years, Kelso-Burnett Co. has been working with FedEx to keep up with their growing operational needs. In Wheeling, Illinois, Kelso-Burnett worked to increase the facilities size by constructing a new addition to an existing warehouse. Kelso-Burnett Co. electricians installed new conveyors, panels, high voltage stations, new shoots for mail sorting, and […]
1300 E Northwest Highway, Palatine, IL Architect: Giffels, Inc. General Contractor: Clayco Construction Recently, Kelso-Burnett Co. worked to complete two phases of a design-build at the United States Postal Service Mail Processing Center in Palatine, Illinois. The project consisted of a 54,000 square foot expansion of the existing facility for the relocation of existing equipment. Kelso-Burnett’s design-build responsibilities included Service Distribution, Lighting & Lighting […]
Edit Post Switch to draftPreviewUpdateabout:blankAdd title 111 E. Wacker Drive, Chicago, IL Architect: Interior Architects, and Partners By Design General Contractor: Interior Alterations, Inc., and Pepper Construction For many years, Kelso-Burnett Co. has performed a large majority of the electrical work required on Bankers Life & Casualty’s major build-out projects. In 2005, Kelso-Burnett worked to complete a 200,000 square-foot office build-out for Bankers Life […]